Mt. Midori snow report

Mt.Midoridake hiking report
From Kougen onsen to Mt.Midoridake
Snow on the trail is melting gradually.

At Daiichi Hanabatake there is no snow on wooden trail except the edge.
(Photo ①)
At Daini Hanabatake wooden trail at the bottom is 60% appeared.
From the middle point to Eiko no sawa you have to walk on the snow.
At Palm tree area most of trail has no snow like summer, but you have to walk on snow once.
From Mt.Midoridake to Mt.Koizumidake “Dryas octopetala”is going to peak to bloom.

Near the Mt. Hakuun hut

As announced before, Mt.Hakuunndake Refuse Hut is under the rebuilding now.

July 3rd and 4th Construction material and Construction equipment or machine were unloaded.
July 7th they teared down the old hut.
As shown in photo ① most space of camping ground are occupied by construction material.
There are only 10 camping sites.
And also temporary hut is there, but only a few people can stay.
Thinking capacity of tent sites and hut, it is difficult to stay Mt.Hakuun Hut on the weekend.
If you plan to traverse mountains, please rebuild your hiking plan.

As shown in photo ② some construction machines are working.
So it is very dangerous, do not come close to these machine.

Hikers can use toilet.
But sometimes Hikers can not use it when construction machine is working near the toilet.
Please bring disposable toilet.