*Prefectural road 223 Aizankei~Kamikawa line is postponed to open.
This road open was planned May 7th.
A avalanche occurred, it postponed to open.
and also Aizankei spa is closed.
We don’t know when the road open.
As soon as we know details, we post on this site.
This road open was planned May 7th.
A avalanche occurred, it postponed to open.
and also Aizankei spa is closed.
We don’t know when the road open.
As soon as we know details, we post on this site.